Castle 6th Form

School Extension & Refurbishment

This changing room extension and refurbishment was a great success offering the school a new and extended changing area and the reuse of existing unused space.

The new individual shower cubicles were a great improvement.
showers

Our relationship with the school was extremely good and we worked closely with them to ensure the minimum of disruption to their activities. References from the school, Architect and Employers Representative are all available upon request.

The shower block was in such a bad state of repair that it had becaome unusable. All the existing showers were removed and the entire area reconfigured.

showers20before

New changing facilities were also installed after the reconfiguration.

changing20room

Woodlands School

Woodlands School, Coleshill

MHCL were involved in the erection of this new prefabricated off site class room at Woodlands and the installation of the new disabled access.

New Entrance

woodlandschool1

New Ramp and Handrail

woodlandschool2